Region · SharurahTransformer Foundation — SharurahConstruction of a transformer foundation in Sharurah. The site photographs show excavation, foundation and cable-trench works inside an operating station, alongside the receipt of the power transformer and its cooling assembly and its movement on a multi-axle hydraulic trailer.Photo-documented items6Frames from site18View projectProjects
Evidence from the field
A selection from the company's projects, chosen because we hold photographic documentation from site for them — not the full record of works. Client names, contract values and durations are not shown unless they are documented and cleared for publication.
Region · SharurahTransformer Foundation — SharurahConstruction of a transformer foundation in Sharurah. The site photographs show excavation, foundation and cable-trench works inside an operating station, alongside the receipt of the power transformer and its cooling assembly and its movement on a multi-axle hydraulic trailer.Photo-documented items6Frames from site18View project
Region · BishaBisha ProjectA project executed in Bisha. The site photographs show a large concrete structure being built with formwork, reinforcement, scaffolding, foundation and waterproofing works, including night shifts.Photo-documented items6Frames from site18View project
Region · JazanTransformer Protection Walls — Jazan ProjectConstruction of transformer protection walls within the Jazan project. The site photographs show cast-in-place concrete walls with surrounding scaffolding, alongside foundation, waterproofing, backfill and compaction works.Photo-documented items6Frames from site16View project
Region · AsirControl Rooms Rehabilitation — AsirRehabilitation works to control rooms in Asir. The site photographs show large wall panels being installed on steel frames and bases, alongside plinth, levelling and floor-opening works for services.Photo-documented items6Frames from site18View project
Region · JazanWarehouses for Power Stations — Jazan ProjectConstruction of warehouses for power stations within the Jazan project. The site photographs show steel-framed warehouses handed over with epoxy floors, completed walls and installed storage racking.Photo-documented items6Frames from site12View projectThe full record of works is issued with the company profile on request. Request the company profile